Tuesday, May 19, 2009

The street is a mess

Replacing the old water main seems to be a project that will last all spring, and maybe into the summer. I slipped on the loose gravel/asphalt and required 5 stitches to repair the skin on my knee. Also a tetanus shot.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home